Question
PART IIIChoose the best answer from the given alternatives (1pts each) E. inconsistency or imbalance __ I __ comes from unecessary processingthatdoes not add value to the item being produced or workedon. C Over-production waste 1) Processing waste ENone __ 2. when more goods are produced than can besold resulting in ide finished goods inventory When anything - people, equipment, supplies tools, documents, or materials -is moved or transported unnecessarily from one location to another. A. Over-production waste B. Inventorywaste C. Motion wasteD Defects B.None __ 3 __ come from the purchasing issuance, storagest excess or excessive supplies, materials and other resources A Processing wastes Transportwaste C.Waiting-time waste D. None __ A. when ammecessary body movement's aremadewhen performing atasi. Examples are searching reaching of bending lifting and other unnecessary hodily movements. A. Over-production waste B Waiting-time waste C. Motion waste D None __ 5. Which one of the following is the steps to effective waste ellmination EXCEPT A. Make waste visible B. Be conscious of the waste for the waste D. Measure the waste Enone 20. The PDCA processis used in:A. Work instructions only B. Procedures only C. Both workinstructions procedures D. Neither work instructions nor procedures question does: procedure NOT typically address? A. Where do the imputs come from? B. What speatering laken? outputs go? D. Who performs which action?
Solution
Expert Verified
4.1(244 Voting)
LeonardElite · Tutor for 8 years
Answer
1. D. Processing waste <br />Processing waste comes from unnecessary processing that does not add value to the item being produced or worked on.<br /><br />2. A. Overproduction waste <br />Overproduction waste occurs when more goods are produced than can be sold, resulting in idle finished goods inventory.<br /><br />3. D. None <br />The description provided does not match any of the given options for waste types.<br /><br />4. C. Motion waste <br />Motion waste refers to unnecessary body movements made when performing a task, such as searching, reaching, bending, lifting, and other unnecessary bodily movements.<br /><br />5. E. none <br />All the listed steps (Make waste visible, Be conscious of the waste, Be accountable for the waste, Measure the waste) are part of effective waste elimination.<br /><br />20. C. Both work instructions and procedures <br />The PDCA (Plan-Do-Check-Act) process is used in both work instructions and procedures.<br /><br />21. B. What specific actions should be taken? <br />A procedure typically addresses what specific actions should be taken, so this question is asking for what it does not address.
Click to rate: